Carmacks Pre Eng Buildings

001-1024x768

Specifications

The project consisted of two pre-engineered buildings totalling 32,000 sq ft. The larger of the two is used to hold the sand and salt mixture to maintain the Anthony Henday ring road during the winter months. The smaller structure is a Maintenance Garage and two story office structure for staff.

The Maintenance Garage has its own wash bay for the large highway vehicles and a 7.5 ton overhead crane to aid in major equipment overhaul.

Project Class :
Commercial and Institutional Buildings


Client :
Carmack


Municipality :
Edmonton


Province :
AB


Address :
13203 - 156th Street


Category :
Metal & Steel Building Construction